This resolution authorizes the Metropolitan Government of Nashville and Davidson County to abandon existing public water and sanitary sewer infrastructure and to accept new infrastructure for the property located at 110 Berry Street. The infrastructure includes water and sewer mains, fire hydrant assembly, and sanitary sewer manholes as part of specified MWS projects.
A resolution authorizing The Metropolitan Government of Nashville and Davidson County to abandon existing public water and sanitary sewer mains, fire hydrant assembly and sanitary sewer manholes, and to accept new public water and sanitary sewer mains, fire hydrant assembly and sanitary sewer manholes, for property located at 110 Berry Street, also known as Berry Street Infrastructure (MWS Project Nos. 25-WL-71 and 25-SL-167 and Proposal No. 2025M-197ES-001).
What it does
- 1Abandon existing public water and sanitary sewer mains, fire hydrant assembly, and sanitary sewer manholes at 110 Berry Street.
- 2Accept new public water and sanitary sewer mains, fire hydrant assembly, and sanitary sewer manholes for the same property.
- 3Applies to MWS Project Nos. 25-WL-71 and 25-SL-167 and Proposal No. 2025M-197ES-001.
This resolution authorizes the Metropolitan Government of Nashville and Davidson County to abandon existing public water and sanitary sewer infrastructure and to accept new infrastructure for the property located at 110 Berry Street. The infrastructure includes water and sewer mains, fire hydrant assembly, and sanitary sewer manholes as part of specified MWS projects.
Legislative history
Get alerts when RS2026-1823 changes
LegisGo tracks every amendment, substitute, and vote on Metro Council legislation. Free to sign up. Alerts are instant or in a daily digest.
No credit card. Nashville Metro Council coverage is free during launch.